In Arizona, anyone who labors or furnishes professional services, materials, machinery, fixtures or tools to build, alter or repair a structure can file a mechanics' lien. That includes contractors, subcontractors, suppliers, laborers, architects and engineers, provided they are properly licensed, served a preliminary twenty day notice, and are not barred by the owner-occupant rule.
- Lien rights reach contractors, subcontractors, suppliers, laborers and design professionals.
- A contractor who is required to be licensed and is not has no lien rights.
- Everyone except a person performing actual labor for wages must serve a preliminary twenty day notice.
- On an owner-occupied home, only a person with a written contract directly with the owner-occupant can lien.
Who has mechanics' lien rights under Arizona law?
Arizona's statute is broad. A.R.S. § 33-981 gives a lien to every person who labors or furnishes professional services, materials, machinery, fixtures or tools in the construction, alteration or repair of any building or other structure or improvement.
It does not matter whether the owner hired the claimant personally. The statute makes the contractor, subcontractor, architect, builder or other person in charge of the work the owner's agent, so work ordered by the general contractor counts as work done at the owner's request.
| Claimant | Lien rights? | Key condition |
|---|---|---|
| General (original) contractor | Yes | Valid license; preliminary notice |
| Subcontractor | Yes | Valid license; preliminary notice; not on an owner-occupied home |
| Material or equipment supplier | Yes | Preliminary notice; not on an owner-occupied home |
| Laborer paid wages | Yes | No preliminary notice required |
| Architect, engineer or other design professional | Yes | Valid registration and a qualifying agreement |
| Unlicensed contractor | No | Barred by statute |
Can an unlicensed contractor file a mechanics' lien?
No. Under A.R.S. § 33-981, a person who is required to be licensed as a contractor but does not hold a valid Arizona contractor's license does not have lien rights.
The same idea applies to design professionals. A person who furnishes professional services without a valid certificate of registration has no lien rights, and a registered professional can enforce a lien only with an agreement with the owner, or with an architect, engineer or contractor who has an agreement with the owner.
Lack of a license also blocks the lawsuit for payment itself. We cover that rule in whether an unlicensed contractor can sue for payment in Arizona. Owners can confirm a claimant's license history on the Arizona Registrar of Contractors website.
Can a subcontractor or supplier lien an owner-occupied home?
Usually not. Under A.R.S. § 33-1002, no lien may be allowed or recorded against the dwelling of a person who became an owner-occupant before the work, except by a person who signed a written contract directly with the owner-occupant.
So on a remodel of a house the owner lives in, the general contractor who signed with the homeowner may have lien rights, but the framing subcontractor and the lumber yard generally do not. Their remedy is against the party who hired them.
The exemption is narrower than many people assume:
- The owner-occupant must be a natural person holding recorded title before construction began.
- The owner must reside or intend to reside in the dwelling at least thirty days during the twelve months after completion and not intend to sell or lease it.
- The dwelling must be designed for single one-family or two-family residential purposes, including a condominium unit.
Subcontractors and suppliers keep full lien rights on commercial projects, rentals, apartment buildings and homes built for sale. A contract clause in which an owner-occupant gives up this protection is void.
Who has to send a preliminary twenty day notice?
Almost every claimant. A.R.S. § 33-992.01 requires every person who furnishes labor, professional services, materials, machinery, fixtures or tools to serve a written preliminary twenty day notice as a necessary prerequisite to a valid lien. The one exception is a person performing actual labor for wages.
The notice goes to the owner or reputed owner, the original contractor, the construction lender if there is one, and the person the claimant contracted with. It is due not later than twenty days after the claimant first furnishes labor or materials to the jobsite. Under A.R.S. § 33-981, a person required to give the notice can enforce a lien only if the notice was given and proof of service was made.
A late notice is not fatal, but it shrinks the lien to work furnished within the twenty days before the notice and afterward. The step-by-step process is in how to file a mechanics' lien in Arizona.
What should you check before recording or contesting a lien?
Run through the same five questions whether you are the claimant or the owner. Each one can decide the outcome.
- Was the claimant licensed or registered when the work was done, if a license or registration was required?
- Is the property an owner-occupied dwelling, and if so, is there a written contract directly with the owner-occupant?
- Was a preliminary twenty day notice mailed, to the right parties, and on what date?
- Has the 120-day recording period after completion run?
- Is the amount claimed supported by the contract, change orders and credits for payments?
Claimants should remember that recording a lien that is known to be groundless carries statutory penalties, so an honest answer to these questions protects both sides. If the lien route is closed, a breach of contract claim against the party who hired you may still be open.
Gather your contract, license or registration records, the preliminary notice with its proof of mailing, and your first and last dates on the job. Touma Law represents both claimants and property owners in contractor and lien disputes. Request a free case evaluation to have those dates reviewed.
This article relates to the firm's contractor disputes practice. If the situation it describes is yours, the facts and the deadline matter more than the general rule.
Request a free case evaluation →- A.R.S. § 33-981 Lien for labor; professional services or materials used in construction, alteration or repair of structures; preliminary twenty day notice; exceptions. Arizona Revised Statutes, Arizona Legislature.
- A.R.S. § 33-1002 Definitions; inapplicability of certain liens to owner-occupied dwelling; waiver void. Arizona Revised Statutes, Arizona Legislature.
- A.R.S. § 33-992.01 Preliminary twenty day notice; definitions; content; election; waiver; service; single service; contract. Arizona Revised Statutes, Arizona Legislature.

